Work on the trail is progressing steadily. As of July 19, 2012 the Bobcat was up to ~2000′ with the cutters about 1/4 mile ahead of that.
Tag Archives: new trail
Pratt connector connects
The Pratt Connector trail construction is roughed in all the way to the connection with the Pratt railroad grade. In this section a new trail has been blasted into the rock buttress where the old one dipped below it.
PDF archive of maps from Pratt River Trail Connector #1035 Relocation