Granite Creek bridge railings

An old deteriorating log stringer bridge crossing Granite Creek was pulled out last year during the DNR road-to-trail conversion of the Granite Lakes trail last fall. Concrete pads were poured for a pedestrian bridge that will sit far above the creek even at high water, but it will not be installed until this fall, or possibly spring 2014. In the meantime, a temporary bridge constructed from pieces of the old log stringers was put into place. Last winter it was at times a hazardous crossing, especially when icy. Now railings have been added which should provide for a secure crossing until the new bridge arrives.

New railings for a safer crossing

New railings for a safer crossing (photo by bikejr)


Temporary stringers immediately after trail conversion

Temporary stringers shortly after trail conversion

Top is flattened, but still hazardous when icy

Top is flattened, but still hazardous when icy (photo by Richard Perkins)




old crossing

2012 creek crossing on old log stringer bridge

20120901GraniteCreekBefore

2012 view of old bridge from below